A 3-storey building with about 600 m² of wall to plaster needs a 25–35 L/min mortar sprayer rated for 30 m vertical delivery — roughly 150–210 m² per day with a four-man crew.
Below is the arithmetic that gets you to that class of machine, so you can size it from your own wall area instead of a brochure number.
Step 1: Measure wall area, not floor area
A mortar sprayer is sized on square metres of wall, and most buyers start from the building footprint. That is the first error: a 100 m² floor plate in a 3-storey house can carry 550–650 m² of plaster once both faces and the internal partitions are counted.
Start with the external envelope, one face at a time.
| Storey | Perimeter | Storey height | Gross face | Less 15% openings | Net face |
|---|---|---|---|---|---|
| Ground | 40 m | 3.0 m | 120 m² | 18 m² | 102 m² |
| First | 40 m | 3.0 m | 120 m² | 18 m² | 102 m² |
| Second | 40 m | 3.0 m | 120 m² | 18 m² | 102 m² |
| Total | — | — | 360 m² | 54 m² | 306 m² |
That 306 m² is one face of the envelope. Add the inside faces and the internal partitions and a normal 3-storey house lands at 550–650 m². Then add 5–8% for reveals, soffits, column faces and beam sides — the surfaces that consume time and never appear in a drawing take-off.
If the machine type is still open at this stage rather than just the size, the type criteria are in how to choose a mortar sprayer for wall plastering. This article assumes the type is settled and only the capacity is in question.
Step 2: Convert area into mortar volume and bags
The conversion is the easy part, because 1 m² covered 1 mm thick is 1 litre of mortar:
Volume (m³) = area (m²) × thickness (mm) ÷ 1,000
| Coat thickness | Wet mortar | Dry mix per m² | Cement per 100 m² at 1:4 by volume |
|---|---|---|---|
| 10 mm | 10 L/m² | 16–19 kg | 6–7 bags of 50 kg |
| 12 mm | 12 L/m² | 19–23 kg | 7–9 bags of 50 kg |
| 15 mm | 15 L/m² | 24–28 kg | 9–11 bags of 50 kg |
Those are industry ranges for cement–sand plaster at 1:4 by volume, including 10–15% wastage. Confirm them against your own mix design before ordering: sand grading and cement grade move the dry-mix figure by about 10% either way.
Worked example: 600 m² at 12 mm
- Wall area: 600 m² — envelope both faces plus partitions
- Coat: 12 mm average, applied in two passes
- Wet mortar: 600 × 0.012 = 7.2 m³
- Dry mix: 600 × 21 kg ≈ 12.6 t
- Cement at 1:4: ≈ 2.3 t, or 45–50 bags of 50 kg
- Sand: ≈ 10 t, or roughly 6–7 m³ loose
- Mixing water: ≈ 1.0–1.2 m³ at a water/cement ratio near 0.5
Those five numbers — area, volume, bags, tonnes, water — are what you quote against. They also show the machine only has to move about 7 m³ of material across the whole job, which a mid-size sprayer does in 4–6 pumping hours.
Step 3: Check what the machine can actually place
A screw pump’s litre-per-minute rating is a free-flow figure, measured without a nozzle, a loaded hose and a trowel crew behind it. The crew is the real limit: industry practice puts mechanical plastering at 25–35% of free-flow coverage once scaffold moves, corner work and finishing are included.
The same gap between catalogue and site output appears on concrete pumps — the loss chain is set out in actual pump output vs rated output — and the arithmetic is identical here.
| Sprayer class | Free-flow output | Coverage at 12 mm, free flow | Realistic crew rate | Realistic day, 6 effective hours |
|---|---|---|---|---|
| Small | 15–20 L/min | 75–100 m²/h | 15–22 m²/h | 90–130 m² |
| Mid | 25–35 L/min | 125–175 m²/h | 25–35 m²/h | 150–210 m² |
| Large | 40–60 L/min | 200–300 m²/h | 40–55 m²/h | 240–330 m² |
Read the last column, not the second. A mid-size unit finishes the 600 m² example in three to four working days. A small unit needs five to six with the same crew — which is where the apparent saving on the machine disappears.
If the rate drops mid-job rather than from the first wall, the cause is usually the mix or the hose rather than the machine size; work through mortar sprayer clogging checks before you upsize.
Step 4: The three specs that decide a 3-storey unit
Delivery height and hose length
Three storeys is a 9–10 m lift. Add the horizontal run on each floor and count every 90° bend as 1–2 m of straight hose: a realistic layout is 10 m up, 10 m across and three bends, or about 25–30 m of equivalent delivery.
The rule that keeps you out of trouble: rated vertical delivery ≥ 1.5 × actual lift. For a 10 m lift that means a 15 m rating at minimum, and 30 m if you want margin for a worn stator, a rich mix and a long hose. Small sprayers are commonly rated 20 m vertical and 30–40 m horizontal; mid-size units 30–50 m vertical. Pressure is rarely the binding constraint at a 12 mm coat — 6–10 bar at the nozzle covers it — hose length and pump wear are.
Hopper size and refill cycle
Hopper size is a logistics number, not a performance number. Average draw follows directly from the practical rate:
Draw (L/h) = area rate (m²/h) × thickness (mm)
At 30 m²/h and 12 mm that is 360 L/h, or 6 L/min of steady spraying. A 60 L hopper therefore empties in about 10 minutes — so the batching side must produce 360 L/h continuously, and one person with a wheelbarrow will not keep up. Specify a 60–80 L hopper and pair the sprayer with a plaster mixer or a second crew member batching. A larger hopper only lengthens the interval between the same stoppages.
Power supply
Sprayers in this class run 3–7.5 kW. Check what the site actually has before choosing: a 5.5 kW three-phase unit will not run on a single-phase domestic supply, and stepping down to 3 kW single-phase costs 30–40% of the practical rate. Where power is unreliable, a diesel-driven unit removes the problem at the cost of weight and servicing.
Class by job size
| Plaster area | Class | Output | Vertical rating | Hopper | Motor | Crew |
|---|---|---|---|---|---|---|
| Under 300 m² | Small | 15–20 L/min | 20 m | 40 L | 3 kW | 3 |
| 300–700 m² | Mid | 25–35 L/min | 30–40 m | 60–80 L | 5.5 kW | 4 |
| Over 700 m² | Large | 40–60 L/min | 50 m | 80–120 L | 7.5 kW | 5–6 |
What changes when the building has three floors
- Material has to go up. At 12 mm, one 200 m² floor consumes about 2.4 m³ of mortar — roughly 3.8–4.2 t. Plan the lifting, not only the spraying.
- Changeover is not free. Moving machine, hose, scaffold and water between floors costs 1–2 hours per floor. Add 10–15% to spray time for every floor above ground.
- Stage the machine low. Leaving the sprayer at ground level and running hose up beats re-siting it, provided the vertical rating covers the full lift with margin. If it does not, staging on the first floor halves the lift.
- Water at height. The 12.6 t of dry mix in the example needs about 1.0–1.2 m³ of water, or 400 L per floor. That is twenty 20-litre cans, or a hose and a drum — decide which before the crew starts.
Sizing checklist before you send an enquiry
- Wall area per storey in m², both faces, openings already deducted.
- Average coat thickness and number of passes.
- Mix design, and whether sand is site-won or supplied.
- Vertical lift and the longest horizontal hose run.
- Power available: single phase, three phase, or none.
- Target completion days and the crew you can field.
- Scaffold type, and whether the machine can stay on the ground.
Quick answers
Is a 20 L/min sprayer enough for three storeys?
On volume, yes: 20 L/min gives 75–100 m²/h free flow, far above a crew’s 15–22 m²/h. It fails on delivery height if lift plus hose exceeds its 20 m rating, and it leaves no margin for a worn stator. Use it below 300 m² with the machine kept low.
Can one sprayer and one crew plaster 600 m² in a week?
Yes, with a mid-size unit: at 25–35 m²/h over six effective hours a day, 600 m² is three to four days plus floor changeovers. Two crews on two units halve that, but only if both have material and water at the working level.
Does a bigger sprayer reduce the trowelling crew?
No. Finishing time is set by wall area, not machine output. Capacity beyond the crew’s finishing rate only adds idle machine hours — the same conclusion the plastering machine vs manual cost comparison reaches from the cost side.