Weigh one litre of foam concrete within ten minutes of discharge: net grams per litre is wet density in kg/m³. A 600 kg/m³ mix passes at 550–650 kg/m³. Anything outside ±50 kg/m³ is caught before the pour, not after.
Wet density is the only foam concrete number you can still fix
Foam volume is the cheapest variable in a CLC mix and the first one to drift. A mix designed at 600 kg/m³ that arrives at 712 kg/m³ carries 18.7% more mass in the same volume: yield drops, insulation value drops, and the cost per cubic metre placed rises while the invoice stays the same.
The opposite error is more expensive. A 600 kg/m³ design delivered at 500 kg/m³ pumps beautifully, floats onto the slab looking perfect, then fails the strength or the thermal target a month later when the slabs are already laid.
Both errors are visible in a single weighing, ten minutes after discharge, while the material is still workable. That is why wet density — not the bag label, not the mix sheet — is the field control number on a foam concrete job.
Three tests, one sample, thirty minutes
Wet density is the fast decision tool. The other two tests exist to prove the decision was right.
| Test | Equipment | When | Pass criterion | What it catches |
|---|---|---|---|---|
| Wet density | 1,000 mL rigid cup, scale to 1 g | 5–10 min after discharge | ±50 kg/m³ of design density | Foam loss, water error, batching error |
| Spread (flow) | 80 × 80 mm open cylinder, flat steel plate | Same sample | Typically 250–350 mm spread at 400–800 kg/m³ | Workability, pumpability, foam quality |
| Cube strength | Three 100 mm cubes, cured wet | 7 and 28 days | Project spec — often 1.0–3.5 MPa at 400–800 kg/m³ as an industry range | Whether the mix actually hardened |
Ranges in the table are industry figures across CLC densities, not a specification for one machine. Your mix design sets the actual numbers, and the wet density target is the one you control truck by truck.
How to run the 1-litre wet density test
- Calibrate once a week. Put a 1,000 g check weight on the scale. If it reads 995 g or 1,005 g, the scale is telling you the density is wrong before the mix does.
- Weigh the empty cup. Record the tare. A steel cup is better than a plastic jug because it does not flex and change volume.
- Fill to the brim and strike off with a straight edge. Do not tamp, vibrate or tap the cup — any of the three collapses foam and reads high.
- Wipe the outside and weigh within 60 seconds. Foam concrete stiffens and drains as it stands; a sample left five minutes reads differently from the same mix weighed immediately.
- Do the arithmetic. One gram per litre equals one kilogram per cubic metre, so the net mass in grams of a full 1,000 mL cup is the wet density directly. No conversion, no correction factor.
- Repeat once if the result is out of tolerance. Take the second sample from a different point in the same discharge before you change anything.
If you use a 500 mL cup instead, double the net mass. If you use a 2,000 mL container, halve it. The container volume is the only divisor that matters.
Worked example: a 600 kg/m³ design
Assumptions stated up front: 1,000 mL steel cup, tare 620 g, scale resolution 1 g, sample taken 6 minutes after discharge.
- Cup tare: 620 g
- Gross mass with sample: 1,243 g
- Net mass: 1,243 − 620 = 623 g
- Wet density: 623 kg/m³ against a 600 kg/m³ design
- Deviation: +23 kg/m³, or +3.8% — inside the ±50 kg/m³ tolerance, pour continues
Now the same mix on the fourth truck of the morning:
- Gross mass: 1,332 g, tare 620 g → net 712 g
- Wet density: 712 kg/m³, deviation +112 kg/m³ (+18.7%)
That is not scatter. Something changed — foam output, water dosing or batching — and the next step is arithmetic, not opinion.
Correcting an out-of-range batch by ratio
Density is mass divided by volume, and the solids mass in the mixer is already fixed. So the volume has to change by the ratio of measured to design density:
Extra foam volume (% of batch) = (measured density ÷ design density − 1) × 100
For the sample above: (712 ÷ 600 − 1) × 100 = 18.7%. The next batch needs foam equivalent to 18.7% of its total volume on top of what was running, then a re-test on the first discharge.
What not to do: add water to “loosen” an over-dense mix. Water adds mass, dilutes the foam already in the mix, and pushes the density the wrong way once the material drains. Change foam volume or change the batch — nothing else.
Density deviation: accept, adjust or stop
| Deviation from design | Reading | Action on site |
|---|---|---|
| 0 to ±25 kg/m³ | Normal scatter | Continue, log the number |
| ±25 to ±50 kg/m³ | Edge of tolerance | Continue this truck, re-test the next, check foam density and water meter |
| ±50 to ±100 kg/m³ | Out of control | Stop, apply the volume ratio, re-test before placing again |
| Over ±100 kg/m³ | Batch failure | Reject or re-blend; check scale calibration and foam generator output |
Tolerances are the ones a site can hold with a 1 g scale. Tighter than ±25 kg/m³ is possible in a lab, not from a discharge hose.
Three things that move density on a real site
1. Foam generator output drifting
Foam that is too wet carries water instead of air, and the mix gains mass with no change on any dial. Catch it at the lance: fill a 10 L bucket for 30 seconds, weigh it, divide by 10. Wet foam density from a healthy generator typically sits in the 45–80 g/L band depending on agent and generator type; above roughly 90 g/L the foam is wet enough to distort a 500–700 kg/m³ mix.
The dilution behind that number is covered in foaming agent dilution ratio.
2. Sand moisture and unmetered water
Weigh 1 kg of sand, dry it, weigh it again. The difference is water you are adding without metering it. On 500 kg of sand per cubic metre, 3% moisture is 15 kg of unaccounted water — enough to shift wet density and enough to cost strength.
3. Pumping pressure
Foam concrete is placed at low pressure. Every metre of lift and every 90° elbow raises line pressure, and pressure compresses bubbles. Industry practice keeps line pressure in roughly the 15–35 bar band through 50–65 mm hose; push the same mix through a long restricted line and the density at the nozzle can read 5–10% higher than the density at the hopper. Test at the discharge point, not at the mixer.
Sampling frequency and the record that protects you
One wet density test per 50 m³ placed, or per pour, whichever comes first — and always the first truck of the day, because that is when the generator is coldest and the sand pile is wettest. Cube sets: three 100 mm cubes per 100 m³ and one set for every structural pour.
A useful QC sheet carries ten fields, all of which fit on one line:
- Date, time, location and pour reference
- Truck or batch number
- Design density (kg/m³)
- Cup tare (g) and gross mass (g)
- Wet density (kg/m³) and deviation (%)
- Foam density at the lance (g/L)
- Spread diameter (mm)
- Water added on site (litres)
- Action taken and re-test result
- Initials
When a client disputes a slab, this sheet is the difference between a conversation and a claim.
What the test cannot tell you
Wet density is a production control, not a performance guarantee. Oven-dry density typically lands 10–25% below the wet figure for normal CLC water content, so quote the dry density your specification asks for and take the wet reading as the proxy — not as the deliverable.
A mix that passes wet density every hour and still fails cubes has a cement-to-filler ratio, a foam quality or a curing problem. That is a mix design question: start from CLC foam concrete mix ratio by density and the foam concrete density vs strength chart before you touch the machine.
If the densities are consistent but the output is not, the problem is upstream of the mix — see CLC foam concrete production setup for the batching and foam-generation sequence.
Need the test sheet and the machine settings for your density?
Send three numbers: the design density in kg/m³, the required output in m³/h, and the foam agent you intend to use. JINLIN’s engineering team returns a machine configuration, the foam density setting to run at that output, and a formal quotation within 24 working hours.
Start from the foam concrete machine range and ask for the spec sheet for the model that matches your density band.